The cost of installing a standby generator depends on the generator size, fuel type, and electrical demand. In NJ, the cost of installing a standby generator for most homes usually ranges from $9,500 to $20,000.
This price often includes the generator unit, an automatic transfer switch, labor, inspections, and needed electrical or fuel upgrades. Costs vary because homes differ in layout, power needs, and local code rules.
Key Takeaways
- In New Jersey, standby generator installation costs typically range from $7,000 to $20,000, depending on system size and site conditions.
- Most NJ installations include the generator, automatic transfer switch, labor, permits, and inspections, while upgrades can increase total cost.
- Larger homes and higher electrical demand raise generator cost and installation labor.
- NJ permits, inspections, and site preparation are required and can affect timelines.
- Accurate NJ pricing requires an on-site review of electrical systems, fuel access, and placement.
Typical Standby Generator Installation Cost Ranges in NJ
In New Jersey, standby generator projects fall into clear price ranges once generator size and scope are known. These ranges reflect NJ labor rates, permit fees, and fuel connection work.
Actual pricing varies by electrical system and fuel access, as explained in this detailed breakdown of home generator installation costs in NJ.
| Tier | Published range | What it covers |
|---|---|---|
|
Entry range (NJ)
|
$9,500 – $11,500 | Smaller systems for essential circuits with minimal site work. |
|
Mid range (NJ)
|
$11,500 – $14,500 | Whole-home systems with standard electrical and gas connections. |
|
Upper range (NJ)
|
$14,500 – $20,000+ | Large homes, long natural gas line runs, or panel upgrades. |
Sources
Disclosures
Cost ranges reflect publicly available national data and manufacturer guidance. New Jersey pricing varies by municipality, site conditions, and code requirements.
How Much Does It Cost to Install a Standby Generator?
It depends on system design and site conditions. The cost of a standby generator installed usually includes equipment, licensed labor, permits, and connection to existing electrical systems. Older panels or higher power demand often add cost. These factors explain why the cost to install a standby generator varies from home to home.
Quick cost summary for NJ:
- Typical range: $9,500 – $20,000
- Main drivers: Generator size, natural gas work, electrical upgrades
- Common add-ons: Panel upgrades, longer gas piping, site prep
What Is Included in the Cost of a Standby Generator Installed
The cost covers equipment and licensed labor. This includes the setup needed for safe, code-compliant operation. Extra work may be needed for older homes or tight lot access. Clear scope details help explain price differences.
Typical NJ cost components include:
- Generator sized for the home’s electrical load
- Automatic transfer switch
- Licensed electrical labor
- NJ permits, inspections, and testing

Generac Standby Generator Installation Cost
The cost depends on the size of the home and the work needed. In NJ, a home Generac generator usually costs $12,000 to $20,000, based on electrical demand and site conditions.
Generac systems use approved transfer switches and follow set installation steps for safety. When Grounded Electric installs these systems, the work follows manufacturer standards and NJ codes, which affects labor time and materials.

Generator Cost by Home Size
Cost for a 2,000 Sq Ft Home
In NJ, a 2,000-square-foot home often needs a mid-range backup generator. Load planning focuses on lighting, refrigeration, heating controls, and key outlets, shown in a generator size chart. Generator cost for this size typically ranges from $11,500 to $14,500. Proper sizing helps keep power steady.
Cost for a 3,000 Sq Ft Home
A 3,000-square-foot home in NJ usually needs a larger home standby Generator. Higher electrical demand increases power generation needs. The cost of a standby generator installed often ranges from $14,000 to $20,000 when panel upgrades or long gas runs are required. Careful review avoids undersized systems.
What Affects the Cost of Installing a Standby Generator?
NJ installation conditions vary by town and property type. Electrical load, fuel access, placement limits, and code rules all affect labor and materials. These factors explain why the cost to install a standby generator differs by home, as explained in this generator guide. Understanding these points helps with planning.

Generator Size and Electrical Load
Generator size affects both price and output. Larger systems supply more power to your home and support more circuits. Load checks determine the required capacity under NJ code rules. Licensed electrician Robert “Bobby” Mulholland uses these checks to match system size to real use.
Fuel Type and Natural Gas Generator Installation
Fuel choice affects installation scope. Natural gas generator installation may require extending a natural gas line and checking the supply capacity. Many NJ homes need meter or pressure checks. All fuel work must meet safety rules.
Electrical Panel and Transfer Switch
An automatic transfer switch is required for standby systems. It safely shifts power from the grid to the generator. Many NJ homes need panel updates to support this switch. These updates add labor and material costs.
Permits, Inspections, and Site Preparation
New Jersey requires permits and inspections for standby generator work. Site prep may include grading or adding a concrete or composite base. Each generator requires firm support and airflow. Local township rules affect cost.
Standby vs Other Generator Types
Backup Generator Installation Cost
Backup generators, also called standby generators, are permanently installed and connect directly to a home’s electrical panel and fuel source.
In New Jersey, the total installation cost typically ranges from $9,500 to $20,000. This includes the generator unit, electrical labor, permits, transfer switch, and basic setup. Costs increase with larger homes, higher electrical demand, and fuel system upgrades.
Portable Generator Installation Cost
Portable generators have a lower upfront cost because they are not permanently installed. In New Jersey, installation-related costs usually range from $500 to $2,000, depending on whether a manual transfer switch or inlet box is added.
The generator itself often costs $500 to $3,000, sold separately. These systems require manual operation and are not designed to power an entire home, which explains the lower total cost.
Installation Requirements and Safety Considerations
Homeowner Verification Checklist Before Installation
NJ homeowners should confirm key details before work begins. This helps with safety, timing, and pricing accuracy. Clear checks reduce delays. Professional review supports these steps.
- Confirm the generator size fits the electrical load
- Confirm fuel source and natural gas line capacity
- Confirm NJ permit duties and inspection timing
- Confirm placement meets clearance rules
Do You Need a Permit to Install a Standby Generator?
Yes. Most NJ towns require permits for standby generator installation. Permits ensure safe links to electrical systems and fuel lines. Inspections check grounding and clearances. Compliance supports safe use.
Do Generac Generators Need a Concrete Slab?
Many standby generators in NJ need a flat base. Generac units often require a concrete slab or approved pad. The base supports weight and limits vibration. Site and frost rules affect design.
Whole House Generator Cost Calculator
A whole-house generator cost calculator gives a rough NJ estimate. It uses home size and generator type for planning. Calculators cannot see panel age or fuel distance. On-site checks give accurate pricing.
Typical NJ homes: 1,200 to 4,000 sq ft.
Type affects equipment and install complexity.
Why this is only a rough estimate
- Calculators can’t see panel age, load details, or transfer switch requirements.
- They can’t price fuel distance, trenching, permits, or utility coordination.
- On-site checks give accurate pricing.
Rough NJ estimate
$—
Enter your home size and pick a generator type.
This is for planning, not final pricing.
Inputs used
Want an accurate price?
Request an on-site checkInstallation Timeline and What to Expect
In New Jersey, installation includes planning, permits, and setup. Physical work often takes one to two days after permits are approved. Inspections can extend the timeline. Clear schedules help manage expectations.

Step-by-Step Standby Generator Installation Process
Installation follows a clear order for safety and code compliance. Each step affects labor time and generator cost. Knowing the process sets clear expectations.
- Electrical load check and site review
- NJ permit filing and approval
- Base prep and generator placement
- Electrical and fuel connections
- Testing and inspection
Whole House Generator Installation Near You
Local NJ experience helps with code and utility rules. Licensed teams familiar with township needs reduce delays. Project Manager and Co-Owner, Barret Abramow, coordinates work with inspections. Local knowledge supports safe installation.
How to Get an Accurate Installation Quote
Accurate NJ quotes require an on-site visit. Electricians review panels, fuel access, and placement options. Robert “Bobby” Mulholland reviews system needs and NJ code rules. This process ensures pricing aligns with actual conditions and supports reliable long-term backup power.
To move forward with a proper evaluation, schedule a consultation with Grounded Electric to review your home and receive a detailed installation quote.